


|
Case studiesA 5 week trial of two PyroPure® PP4 units was conducted in a 15 storey block of flats in the London Borough of Wandsworth from 1 September 2009 to 4 October 2009. A trial of the PyroPure® PP3.5 system was undertaken at the Lynwood Nursing Home in Sunninghill, Berkshire, over a period of just over 2 months, 21 January to 31 March 2009.
Trial PP3.5 Unit to study viability of PyroPure® as part of Gran Canaria's waste programme. January - March 2009 |